Belvedere patio installation completed in County Dublin. Originally patio area was completely renovated. Old wooden decking was removed. The area was slightly expanded outwards and shaped to give some more appeal.
New membrane sheeting was installed to inhibit weed growth. A step was installed at the rear door of the house to help with patio elevations.
The patio was installed using the Belvedere range from Kilsaran. The Colour was curragh gold. We used a Kilsaran paving block for an edging border which we benched in concrete. Charcoal was the colour of the paving block.
Call us now for a quotation on having a new patio area installed using Belvedere flagstones from Kilsaran. You won't find better value or workmanship from any other Patio contractor in Dublin.
Call Office: 01 - 6856262 or on our Mobile: 085 - 8335596
Completed:
Work: Excavated And Removed The Area, Extended The Area As Agreed, Graded Off The Area, New Base Foundation Installed, Membrane Weed Block, New Step(s), Machine Rolled Base
Location: Dublin, Ireland
Completed:
Work: Excavated And Removed The Area, Extended The Area As Agreed, Removed The Garden, New Base Foundation Installed, Membrane Weed Block, New Flowerbeds, Machine Rolled Base, Block Kerbs
Location: Tallaght, Dublin, Ireland
Completed:
Work: Excavated And Removed The Area, Extended The Area As Agreed, New Walling Built, Membrane Weed Block, New Step(s), New Flowerbeds
Location: Belgard, Tallaght, Dublin, Ireland
Completed:
Work: Excavated And Removed The Area, New Base Foundation Installed, Raised Existing Gulleys/Drains To A Suitable Height, Natural Stone Border, Membrane Weed Block, New Step(s)
Location: Sutton Park, Dublin, Ireland
Completed:
Work: Excavated And Removed The Area, New Base Foundation Installed, New Walling Built, Membrane Weed Block, New Flowerbeds, Machine Rolled Base, Block Kerbs, Concrete Block Walls, Concrete Block Pillars
Location: Sandyford, Dublin, Ireland
Completed:
Work: Excavated And Removed The Area, New Base Foundation Installed, Natural Stone Border, Membrane Weed Block, New Step(s), Machine Rolled Base
Location: Leixlip, County Kildare, Ireland
Completed:
Work: Excavated And Removed The Area, New Base Foundation Installed, Retaining Wall Built, Membrane Weed Block
Location: Santry, Dublin, Ireland
Completed:
Work: Excavated And Removed The Area, New Base Foundation Installed, Membrane Weed Block, New Flowerbeds, Block Kerbs
Location: Bettystown, County Meath, Ireland
Completed:
Work: Excavated And Removed The Area, New Base Foundation Installed, Paving Border Installed, Membrane Weed Block, New Step(s), Machine Rolled Base
Location: Santry, Dublin, Ireland
Completed:
Work: Excavated And Removed The Area, Removed The Garden, Installed New Recessed Covers To Replace Manhole Covers, Raised Existing Gulleys/Drains To A Suitable Height, Paving Border Installed, Membrane Weed Block, New Lawn, Flagstones, New Pathway, Block Kerbs
Location: Dublin, Ireland